Packaging Company
Performed due diligence environmental multi-media compliance reviews of several box manufacturing facilities in support of an acquisition.
International Metal Smelter
Developed a comprehensive EH&S Auditing Program for a multi-national firm; this included the definition of the audit program components including:
- Management philosophy,
- Facility risk assessment mechanism,
- Audit processes,
- Audit protocols at the federal and state levels,
- Training of internal auditors and
- Leading of inaugural location audits
In depth review of air compliance practices at multiple locations. Included was the assessment of the current operations of this facility as related to the existing permit and statutory requirements.
Environmental Remediation Liability assessment.
Multinational Chemical Company
Management of a fortune 500 company’s third party environmental assessment program. The program encompasses approximately 500 sites on a global basis. All aspects including scheduling, auditing, reporting and program summary are included. Approximately 100 site visits are conducted on an annual basis. Environmental as well as financial performance elements are reviewed and a rating of environmental risk is generated.
Comprehensive assessment of the international import and export programs and practices of a fortune 500 company; The review consisted of review of internal practices, personnel assignments and performance, performance of external contractors including customs brokers and freight forwarders as well as practices of representative customers. Reviews of activities in multiple offices and at multiple border crossing were completed.
EHS auditing of manufacturing facilities in the European Union. Auditing of chemical manufacturing and plastic processing facilities in England, Spain and Germany has been completed.
Evaluation of a portfolio of properties for Brownfields redevelopment; Developed alternatives for transfer of long term operational liabilities of legacy properties.
Provided SPCC site modification project management supporting design, contract bid and construction execution with a scope of over 40 US facilities.
Completed EHS assessment of toll manufacturing service provider.
Owners Representative: Assembled the capital budget for the proposed construction of a chemical manufacturing facility in Germany.
Provided on site ongoing general safety support for chemical manufacturing and distribution facilities.
Ergonomic assessment completed at a chemical manufacturing and distribution facilities.
Provided confined space entry support at a chemical distribution facility.
Provide construction oversight of an intermodal chemical transfer facility.
International Law Firm
Completed a confidential FOIA data assembly involving multiple governmental agencies.
Fortune 500 Manufacturing Company
Completed an environmental compliance audit of two facilities to be acquired.
Completed an assessment of SARA 313 (TRI) applicability as well as submittal of annual report.
Completed the development of an SPCC plan for a manufacturing facility and an R&D operation.
Fortune 500 Pharmaceutical Company
Providing management of a project involving the removal and relocation of a PET cyclotron including the characterization, demolition, and removal of a radiation contaminated vault.
National Industrial Laundry
Completed an indoor air quality assessment at a commercial laundry facility.
Community Half Way Facility
Completed an indoor air handling facility assessment to certify conformance with standards of the American Correction Association.
Japanese Manufacturer
Completed a multi-discipline compliance assessment.
Comprehensive assessment of air compliance programs and activities completed.
Coordinated a complex air emission stack testing activity including the assessment of the results of the testing.
Completed a magnetic field review to assess the potential exposure of employees to these fields and proposed actions applicable to protect potentially sensitive employees.
Completing a consolidation of hazard communication program materials.
SARA 313 (TRI) submittal to be completed.
Completed the application for a Permit to Install of air handling equipment.
Specialty Chemical Company
Completed gap assessment of Management Systems for a resin manufacturing facility.
Developed components of environmental and safety management systems.
Regional Consulting Firm
Performed due diligence compliance reviews of facilities in multiple manufacturing sectors.
Metal Fabricating Facility
Completed an indoor air quality assessment of a manufacturing facility.
Multi-Site Chemical Manufacturing Facility
Development and presentation of a comprehensive transportation training program.
Comprehensive safety assessments at multiple facilities completed.
Completion of a regulatory assessment defining required training, inspections, audits, and routine regulatory submittals.
Waste Water Treatment Facility
Completed a comprehensive assessment of air permitting compliance; Directed the filing of the Title V air permit.
Regional Engineering and Geo Tech Consulting Firm
Providing management consulting: Completed a review of the standard Health and Safety Plan Template.
Provide on-going Health and Safety support.
Provided support in review of liability reserves for multiple clients.
Multi National Lubricants Company
Assisted in the assessment of company environmental reserves.
International Chemical Company
Completed Environmental due diligence review of potential acquisition facilities.
Private Midwest College
Guided a team of staff through the process of development of a comprehensive emergency response plan.
UK Based Chemical Company
Toxic Substance Control Act (TSCA) applicability evaluation. The review considered the area of export notification for this multi-national firm. Raw materials, product formulations and customer specific export transaction were review. Unique databases were developed with query capabilities to analyze the thousands of export / product permutations. Recommendations for modifications to the TSCA 12b compliance process were provided.
Asbestos Remediation Company
Provided consultation on asbestos monitoring.
National Scrap Metal Processing Company
Provided assessment of air emission activity. Developed a solution to collect and treat emissions from industrial cutting operations.
Developed and submitted permit to operate applications for a scrape reclamation facility.
International Beverage Company
Conducted environmental assessments at 100 facilities in North America. Defined the local and state specific requirements for each location.
Private Equity Companies
Provided support in acquisition due diligence of multiple international and domestic sites.
Regional Hospital
Completed biannual (Blue Card) air emissions report and as assessment of potential compliance issues related to several large multi-fueled boilers.
Agriculture Operation
Swine Operation (CAFO): Assisted the facility with the review of potential odor reduction technologies and strategies in response to a Notice of Violation issued by the Michigan DEQ. Developed a compliance timeline including selection of equipment to reduce odors, conducted on-site monitoring to document odor reduction and supported negotiation with the DEQ.
International Chemical Importer
Completed an assessment of international trading practices of this specialty chemical company.
Electric Device Manufacturer
Electrical Motor Manufacturing Operation: Performed due diligence environmental multi-media compliance review of this manufacturing facility in support of an acquisition.
International Consulting Company
Provided management consulting services.
International Motor Oil Company
Development of SPCC templates for use by customers in multiple industries.
International Retailer
Completed an indoor air quality assessment.
Regional Landfill
Completed site assessment checklists for evaluation of landfill reclamation possibilities.
Complete an assessment of air regulation compliance. Developed and submitted a fugitive dust permit application. Developed documentation to show the landfill was not subject to NSPS Subpart WWW (landfill gas control systems).
Using the LandGEM program, develop a project landfill gas availability study to be used as the assessment of a landfill gas to energy recovery project.
County Landfill
Develop a permit exemption request to modify a pass gas collection system into an active collection system to allow for testing landfill gas flow rates related to an energy recovery project.
Complete an assessment of air regulation compliance. Developed and submitted a fugitive dust permit application. Developed documentation to show the landfill was not subject to NSPS Subpart WWW (landfill gas control systems).
Multiple Chemical Companies
Continue to provide review of internal EHS management systems according to Synthetic Organic Chemical Manufacturers Association (SOCMA) guidelines.
International Pharmaceutical Manufacture
Coordinated the removal of a cyclotron used in the manufacture of nuclear medicines; providing for site decontamination and waste disposal.